Bobcat B-120A Operations Instructions

Browse online or download Operations Instructions for Water heaters & boilers Bobcat B-120A. Bobcat B-120A Operating instructions User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS AND
STATEMENTS BEFORE READING THE
INSTALLATION INSTRUCTIONS
WARNING
LIQUEFIED PETROLEUM (L.P.)
PROPANE GAS-FIRED BOILERS
Installation location ONLY as permitted in paragraph
entitled "LIQUEFIED PETROLEUM (L.P.) PROPANE GAS-
FIRED BOILER LOCATION" on page 5 of this instruction
book.
The above warning does not apply to NATURAL
gas fired boilers.
The installation must conform to the requirements of the
authority having jurisdiction or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI Z223.1-
latest edition or
CSA B149.1-05 for natural gas and
propane. The installation must also conform to the
additional requirements in this Slant/Fin Instruction Book.
In addition, where required by the authority having juris dic -
tion, the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1 or
CSA
B149.1-05 for natural gas and propane. If there is any
conflict in the above requirements, then the more stringent
requirement will apply.
WARNING
This boiler, gas piping and accessories must be
installed, connected, serviced and repaired by a
trained, experienced service technician, familiar with all
precautions required for gas-fired equipment and
licensed or otherwise qualified, in compliance with the
authority having jurisdiction.
WARNING
The venting system of this boiler is under positive pressure. Leakage
from this system can be hazardous and if not avoided can result in
death or serious injury. In addition to the recommendations within this
manual and the User’s Information Manua
l, the venting system, from
the flue collector to the outdoor discharge, must be carefully checked
annually by a qualified service agency.
This manual must be left with owner and should be
hung on or adjacent to the boiler for reference.
BOBCAT
INSTALLATION AND OPERATING INSTRUCTIONS
Printed in Canada 0711 Part No. 86-5736 Publication No. B -40 Rev. G
Heating Contractor
Address
Phone Number
Boiler Model Number
Boiler Serial Number
Installation Date
DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER
HOT WATER MODELS B-120A and B-200A
GAS-FIRED BOILERS FOR NATURAL AND L.P. PROPANE GASES
TABLE OF CONTENTS
Dimensions, Rating and Orifice Sizes...........................................2
Identification of Parts.....................................................................3
Installation Requirements..............................................................4
Contamination Prevention.............................................................5
Mounting the boiler on a wall ........................................................6
Venting Application........................................................................6
Boiler Room Air Supply and Ventilation ........................................6
Non-Direct Vent Installation...........................................................6
Flue Gas Venting Requirements ...................................................7
Additional Installation Requirements for Massachusetts..............7
Vent and Air Intake Material...........................................................7
PVC/CPVC Pipe General Assembly Method ................................8
Vent and Air Intake Restrictions ....................................................8
Sidewall Venting, Non-Direct Vent ................................................9
Vent Termination Location and Clearance ....................................9
Non-Direct Vent Vertical Venting ...................................................9
Direct Vent Installation...................................................................9
Sidewall Venting, Direct Vent ........................................................9
Alternate Sidewall venting for direct or non-direct venting.........14
Vent/Air Intake Termination Installation .......................................16
Direct Vent, Venting and Air Intake through a Roof ....................17
Venting and Air Intake Regular Inspection..................................18
Condensate Removal System.....................................................18
Gas Piping ...................................................................................18
Electrical Wiring...........................................................................19
Wiring Diagram............................................................................20
Single and Multi Zoning ..............................................................22
Water Piping ................................................................................24
Operating Instructions.................................................................30
Boiler Control Display..................................................................30
Boiler Control...............................................................................30
Sequence of Operation ...............................................................36
Gas Input Rate Adjustment .........................................................37
Safety Check ..............................................................................38
Care and Maintenance................................................................41
General Troubleshooting Guide..................................................42
Appendix A&B ............................................................................43
Page view 0
1 2 3 4 5 6 ... 43 44

Summary of Contents

Page 1 - IMPORTANT

IMPORTANTREAD ALL OF THE FOLLOWING WARNINGS ANDSTATEMENTS BEFORE READING THEINSTALLATION INSTRUCTIONSWARNINGLIQUEFIED PETROLEUM (L.P.)PROPANE GAS-FIRE

Page 2

BOBCAT MODELS B-120A and B-200A NON-DIRECT VENT, SIDEWALL VENTINGAll joints must be liquid and pressure tight. Use 3” dia. Certified PVC or CPVC Vent

Page 3

Bobcat Models B-120A and B-200A11BOBCAT MODELS B-120A and B-200A NON-DIRECT VENT, VENTING THROUGH A ROOFAll joints must be liquid and pressure tight.

Page 4

Bobcat Models B-120A and B-200A12BOBCAT MODELS B-120A and B-200A NON - DIRECT VENT, UTILIZING AN EXISTINGCHIMNEY AS A CHASEAll joints must be liquid a

Page 5

Bobcat Models B-120A and B-200A13BOBCAT MODELS B-120A and B-200A - DIRECT VENT, SIDEWALL VENTINGAll joints must be liquid and pressure tight. Use 3” d

Page 6

Alternate Sidewall venting for direct or non-direct venting:1. Vent and/or air intake piping may be installed per figure12a in order to provide enough

Page 7 - Boiler Adapter

Bobcat Models B-120A and B-200AFigure 13a. Vent/Air intake termination; utilizing Certified PVC or CPVC Venting pipe for venting.Figure 13b. Vent/Air

Page 8

VENT/AIR INTAKE TERMINATION FOR PVC/CPVC VENTING INSTALLATIONThis termination is designed specifically for 3” diameter PVCor CPVC Schedule 40 pipe to

Page 9

Bobcat Models B-120A and B-200AB. DIRECT VENT - VENTING AND AIR INTAKE THROUGH A ROOFFigure 14 shows typical vertical venting. The vent pipe mustpass

Page 10

VENTING AND AIR INTAKE SYSTEM REGULAR INSPECTIONA. Inspect the system regularly for condensation, corrosion,sagging and/or physical damage. A qualifi

Page 11

At 9.1m (30 ft.) length of pipe, match requiredcapacity from table on this page (choose highercapacity, in this case is 4.3m3/hr. [152 cu. ft. per hr]

Page 12

Bobcat Models B-120A and B-200A2RATINGS AND DIMENSIONSFigure 1. Dimensions dataBobcat Boiler178mm (7")58mm(2-1/4")108mm(4-1/4")102mm(4&

Page 13

Figure 16a. Schematic wiring diagram.20Bobcat Models B-120A and B-200A

Page 14 - 508 MM (20") MAX

Bobcat Models B-120A and B-200A21Figure 16b. Boiler Control.Figure 16c. Ladder wiring diagram.

Page 15

Figure 17a. Multizoning of Bobcat boiler; zone valve system.Figure 17b. Multizoning of Bobcat boiler; pump zoning system using R845A relay.22Bobcat Mo

Page 16

Bobcat Models B-120A and B-200A23Figure 17c. Multizoning of Bobcat boiler; pump zoning system using R882A/B relays.Figure 17d. Single zoning of Bobcat

Page 17 - SNOWLINE

WATER PIPING 1. Connection of system to boiler:Primary/secondary piping of the system is mandatory, toensure the proper flow through the boiler. (See

Page 18 - (1 020 BTU/cu.ft. )

Bobcat Models B-120A and B-200A25Figure 18. Relief Valve and Low Water Cutoff Installation25mm × 25mm × 19mm(1" × 1" × 3/4") NPT TEE

Page 19

Table 2a. Recommended pump models for domestic hot water tank piping to the Bobcat model B-120A boiler.Table 2b. Recommended pump models for domestic

Page 20

Bobcat Models B-120A and B-200A27Figure 20. Zoning with circulators.EXPANSION TANK(DIAPHRAGM TYPE)

Page 21 - Figure 16b. Boiler Control

Figure 21. Zoning with zone valves.EXPANSION TANK(DIAPHRAGM TYPE)DIRECTRETURN28Bobcat Models B-120A and B-200A

Page 22

Bobcat Models B-120A and B-200A29Figure 22. Piping a heating-cooling system to the boiler and a chiller.EXPANSION TANK(DIAPHRAGM TYPE)DIRECTRETURN

Page 23

Bobcat Models B-120A and B-200A3LOCATION AND IDENTIFICATION OF PARTSFigure 2. Location and identification of parts (model B-120A is shown)

Page 24

OPERATING INSTRUCTIONSI. FILLING AND VENTING WATER SYSTEMSA. Fill the system with water. Vent or purge of air.B. Fire the boiler as soon as possible (

Page 25 - 25mm × 25mm × 19mm

Bobcat Models B-120A and B-200A31Figure 23. Display BoardMODEDISPLAYDESCRIPTION & TEMPERATURE DISPLAYBoiler is in stand-by mode.Temperature displa

Page 26

MODEDISPLAYDESCRIPTION & TEMPERATURE DISPLAYSpace heating supply water temperature could be changed bypressing “Up/Down” button. Settable from 90°

Page 27 - (DIAPHRAGM TYPE)

Bobcat Models B-120A and B-200A33MODE DISPLAYDESCRIPTIONChanging space heating post pump time. Settable from 10 to 900 seconds.(steps of 10 seconds).

Page 28

68°F(20°C)Figure 24. Space Heating mode with outside sensor water set point graph.200°F(93.3°C)190°F(87.8°C)185°F(85°C)180°F(82.2°C)170°F(76.7°C)160°F

Page 29

Bobcat Models B-120A and B-200A35III. INITIAL STARTSafe lighting and other performance criteria were met when testingvarious gas manifold and control

Page 30

Bobcat Models B-120A and B-200A36THERMOSTAT CALLS FOR HEATCIRCULATOR(S) ON5 SECOND PRE-PURGE PERIODBOBCAT BOILER MODELS B-120A and B-200A SEQUENCE OF

Page 31

Bobcat Models B-120A and B-200A37IV. CHECK COMBUSTION AND FUEL INPUT RATEA. Remove the boiler jacket front panel, by turning the 2 black screws 1/4 tu

Page 32

4. If the fuel input is not at the rate specified on page 2at the minimum firing rate, then the blower speed should be adjusted to attain the specifie

Page 33 - 3: Plate heat exchanger

Bobcat Models B-120A and B-200A39B. BLOCKING ERRORS: Indicated by an “E” in the mode display. Operation is automatically restored, once the condition

Page 34 - Slope = 0.1 (min,)

SAFETYKEEP THE BOILER AREA CLEAR AND FREE FROMCOMBUSTIBLE MATERIALS, GASOLINE AND OTHERFLAMMABLE VAPORS AND LIQUIDS.MINIMUM CLEARANCES FROM COMBUSTIBL

Page 35

ERROR CODE INDICATION REMEDY30Excess Flue TemperatureCheck flue gas temperature, at the maximum firingrate and high water temperature. If the flue gas

Page 36

Bobcat Models B-120A and B-200A41CARE AND MAINTENANCEThis section must be brought to the attention of the owner by theinstaller so that the owner can

Page 37

GENERAL TROUBLESHOOTING GUIDE FOR SERVICE PERSONNELWARNING: Only a trained, experienced service technician should perform troubleshooting. Turn off al

Page 38

Bobcat Models B-120A and B-200A43APPENDIX AThermostat Heat Anticipator SettingsFixed anticipator thermostats are not adjustable.Adjustable anticipator

Page 39

SLANT/FIN LTD/LTEE, 6450 Northam Drive, Mississauga, Ontario L4V 1H9• Phone: (905) 677-8400 / FAX: (905) 677-1829 / Order Desk Fax: (905) 677-9015www.

Page 40

CONTAMINATION PREVENTIONThe combustion air supply must not be susceptible to contami-nation sources, whether the combustion air comes from theinterior

Page 41 - WARNING:

MOUNTING THE BOILER ON A WALLBe sure that the wall is vertically plumb and capable of carryingthe weight of the boiler and the system piping, when ful

Page 42

A. NON-DIRECT VENT INSTALLATION1. Air drawn horizontally from outdoors DIRECTLYthrough an outside wall; one louvered opening near thefloor and one lou

Page 43 - APPENDIX B

PVC/CPVC PIPE GENERAL ASSEMBLY METHOD (AirIntake Only)The following are the recommended methods for cutting, cleaning and connecting PVC and CPVC pipe

Page 44 - ©Slant/Fin Corp. 2010

Bobcat Models B-120A and B-200A98. The horizontal vent and air intake pipes must besupported with pipe straps, at intervals no greater than1524mm (5 f

Comments to this Manuals

No comments